PoC Framework: Difference between revisions

From NTECHwiki
No edit summary
 
(23 intermediate revisions by one other user not shown)
Line 1: Line 1:
__TOC__
__TOC__


= MEC PoC Framework Document =
= AFI PoC Framework Document =
The MEC Proof of Concept (PoC) Framework GS describes the full IEG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:
The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: [http://www.etsi.org/deliver/etsi_ts%5C103300_103399%5C103371%5C01.01.01_60%5Cts_103371v010101p.pdf INT AFI PoC Framework]


[http://docbox.etsi.org/ISG/MEC/ieg/70-Draft/IEG5/MEC-IEG005v030.docx (final draft for approval)].
For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.


For convenience, a direct link to the PoC Proposal/PoC Report templates and a summary of the PoC Proposal acceptance criteria are provided below.
= Templates =


= Templates =
[//intwiki.etsi.org/images/AFI_PoC_proposal_template.doc  AFI PoC Proposal Template (word)]
 
[//intwiki.etsi.org/images/AFI_PoC_report_template.doc  AFI PoC Report Template (word)]
 
Optional:


[[Media:MEC_PoC_proposal_template.doc | MEC PoC Proposal Template (word)]]
[//intwiki.etsi.org/images/AFI_PoC_testplan_template.doc AFI PoC Test Plan Template (word)]


[[Media:MEC_PoC_report_template.doc | MEC PoC Report Template (word)]]
[//intwiki.etsi.org/images/AFI_PoC_feedback_template.doc AFI PoC Feedback Template (word)]


= PoC Topics =
= PoC Topics =


PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. [[Poc Topics|See details and current PoC Topics]].
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. [[PoC Topics|See details and current list of PoC Topics]].


= Acceptance Criteria =
= Acceptance Criteria =
The PoC Proposals shall fulfill the following acceptance criteria:
* The PoC Proposal will follow the PoC Proposal Template
* The PoC Proposal will follow the PoC Proposal Template
* The PoC Team will have at a minimum 3 different organizations:
* The PoC Team will have at a minimum 3 different organizations:
** at least one network operator;
** at least one network operator;
** at least one infrastructure provider;
** at least two vendors
** at least one content/application provider.
* The PoC Point of Contact will be an INT AFI WG Participant.
* The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
* The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
* The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events


= CTI support =
= CTI support =
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.  
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.  


MEC PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].
AFI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].
 
= About INT AFI =
ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:


= About ISG MEC =
* a reference model for a Generic Autonomic Network Architecture (GANA);
ISG MEC is creating a standardized, open environment which will allow the efficient and seamless integration of applications from vendors, service providers, and third-parties across multi-vendor Mobile-edge Computing platforms.


ISG MEC has developed a MEC PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of the ISG MEC work.
* an implementation guide for the GANA reference model;


[http://www.etsi.org/technologies-clusters/technologies/mec Learn more about ISG MEC]
* autonomics-enabled implementation-oriented architectures that are a result of GANA instantiations onto various reference architectures defined by standardization organizations such as: 3GPP, BBF, IEEE, ITU-T, and other SDOs

Latest revision as of 13:56, 18 September 2018

AFI PoC Framework Document

The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: INT AFI PoC Framework

For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

AFI PoC Proposal Template (word)

AFI PoC Report Template (word)

Optional:

AFI PoC Test Plan Template (word)

AFI PoC Feedback Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. See details and current list of PoC Topics.

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least two vendors
  • The PoC Point of Contact will be an INT AFI WG Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

AFI PoC Teams may request CTI assistance by contacting ETSI CTI.

About INT AFI

ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:

  • a reference model for a Generic Autonomic Network Architecture (GANA);
  • an implementation guide for the GANA reference model;
  • autonomics-enabled implementation-oriented architectures that are a result of GANA instantiations onto various reference architectures defined by standardization organizations such as: 3GPP, BBF, IEEE, ITU-T, and other SDOs