PoC Framework: Difference between revisions

From NTECHwiki
No edit summary
 
(10 intermediate revisions by one other user not shown)
Line 2: Line 2:


= AFI PoC Framework Document =
= AFI PoC Framework Document =
The AFI Proof of Concept (PoC) Framework TS describes the full NTECH AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:
The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: [http://www.etsi.org/deliver/etsi_ts%5C103300_103399%5C103371%5C01.01.01_60%5Cts_103371v010101p.pdf INT AFI PoC Framework]
 
[http://www.etsi.org/deliver/etsi_ts%5C103300_103399%5C103371%5C01.01.01_60%5Cts_103371v010101p.pdf NTECH AFI PoC Framework]


For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
Line 10: Line 8:
= Templates =
= Templates =


[[Media:AFI_PoC_proposal_template.doc | AFI PoC Proposal Template (word)]]
[//intwiki.etsi.org/images/AFI_PoC_proposal_template.doc AFI PoC Proposal Template (word)]
 
[//intwiki.etsi.org/images/AFI_PoC_report_template.doc  AFI PoC Report Template (word)]
 
Optional:
 
[//intwiki.etsi.org/images/AFI_PoC_testplan_template.doc  AFI PoC Test Plan Template (word)]


[[Media:AFI_PoC_report_template.doc | AFI PoC Report Template (word)]]
[//intwiki.etsi.org/images/AFI_PoC_feedback_template.doc AFI PoC Feedback Template (word)]


= PoC Topics =
= PoC Topics =


PoC Projects are expected to be scoped arround PoC Topics identified and agreed by NTECH AFI WG. [[PoC Topics|See details and current list of PoC Topics]].
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. [[PoC Topics|See details and current list of PoC Topics]].


= Acceptance Criteria =
= Acceptance Criteria =
Line 24: Line 28:
** at least one network operator;
** at least one network operator;
** at least two vendors
** at least two vendors
* The PoC Point of Contact will be an NTECH AFI WG Participant.
* The PoC Point of Contact will be an INT AFI WG Participant.
* The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
* The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, NTECH meeting, a related conference, or other events
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events


= CTI support =
= CTI support =
Line 33: Line 37:
AFI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].
AFI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].


= About NTECH AFI =
= About INT AFI =
ETSI NTECH AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:  
ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:  


* a reference model for a Generic Autonomic Network Architecture (GANA);  
* a reference model for a Generic Autonomic Network Architecture (GANA);  

Latest revision as of 13:56, 18 September 2018

AFI PoC Framework Document

The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: INT AFI PoC Framework

For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

AFI PoC Proposal Template (word)

AFI PoC Report Template (word)

Optional:

AFI PoC Test Plan Template (word)

AFI PoC Feedback Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. See details and current list of PoC Topics.

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least two vendors
  • The PoC Point of Contact will be an INT AFI WG Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

AFI PoC Teams may request CTI assistance by contacting ETSI CTI.

About INT AFI

ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:

  • a reference model for a Generic Autonomic Network Architecture (GANA);
  • an implementation guide for the GANA reference model;
  • autonomics-enabled implementation-oriented architectures that are a result of GANA instantiations onto various reference architectures defined by standardization organizations such as: 3GPP, BBF, IEEE, ITU-T, and other SDOs