PoC Framework: Difference between revisions

From NTECHwiki
No edit summary
 
(52 intermediate revisions by one other user not shown)
Line 1: Line 1:
__TOC__
__TOC__


= NFV ISG PoCs =
= AFI PoC Framework Document =
NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.  
The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: [http://www.etsi.org/deliver/etsi_ts%5C103300_103399%5C103371%5C01.01.01_60%5Cts_103371v010101p.pdf INT AFI PoC Framework]


[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]
For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.


= Framework Document =
= Templates =
The PoC Framework document can be downloaded at:


[http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.01_60/gs_NFV-PER002v010101p.pdf NFV-PER002-PoC Framework - pdf version].
[//intwiki.etsi.org/images/AFI_PoC_proposal_template.doc  AFI PoC Proposal Template (word)]


[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version].
[//intwiki.etsi.org/images/AFI_PoC_report_template.doc  AFI PoC Report Template (word)]


You'll find the templates for PoC Proposals and PoC Reports at the end of those documents.
Optional:


= Q&A =
[//intwiki.etsi.org/images/AFI_PoC_testplan_template.doc  AFI PoC Test Plan Template (word)]
See below some usual questions about the NFV ISG PoCs:


'''I would like to submit a POC proposal where can I find a Word version of the template?'''
[//intwiki.etsi.org/images/AFI_PoC_feedback_template.doc  AFI PoC Feedback Template (word)]
You can find a link to the word version of the PoC Framework (including the templates) at:
[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version]


'''Do all of the POC participants have to be NFV ISG participants?'''
= PoC Topics =
No, it is only required that (at least) one of the supporting Network Operators or Service Providers
is member of the NFV ISG. See Section 4.5 of the PoC Framework:
 
''“4.5 NFV ISG PoC Proposal Acceptance Criteria
The criteria for acceptance of NFV ISG PoC Proposals are:
1) The NFV ISG PoC Proposal shall contain the information requested in the format of the NFV ISG PoC
Proposal Template of clause A.1.
2) The organizations participating in an PoC Project shall include at least two Manufacturers and at
least one Network Operator or one Service Provider, where at least the one Network Operator or the one 
Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “''


'''Where do I send the completed proposal?'''
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. [[PoC Topics|See details and current list of PoC Topics]].
Once your proposal completed, you need to:
1) upload it to the ETSI portal as a regular contribution
2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to  
the uploaded contribution included in the body. To be able to post your email, you will need to subscribe to
that list if not already done. See section 4.3 of the PoC Framework:
''“4.3 NFV ISG PoC Proposal Submission
PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal
according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the NFV
ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the
dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject line.”''


= ETSI CTI Support =
= Acceptance Criteria =
The PoC Proposals shall fulfill the following acceptance criteria:
* The PoC Proposal will follow the PoC Proposal Template
* The PoC Team will have at a minimum 3 different organizations:
** at least one network operator;
** at least two vendors
* The PoC Point of Contact will be an INT AFI WG Participant.
* The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events


The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).
= CTI support =
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.  


This experience may be useful to assist the PoC teams with test expertise, administration and project management support.  
AFI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].


NFV ISG PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=NFV_ISG_PoC-Support_Request contacting ETSI CTI].
= About INT AFI =
ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:


= About NFV ISG =
* a reference model for a Generic Autonomic Network Architecture (GANA);
Learn more [http://www.etsi.org/technologies-clusters/technologies/nfv about NFV at ETSI ]
 
* an implementation guide for the GANA reference model;
 
* autonomics-enabled implementation-oriented architectures that are a result of GANA instantiations onto various reference architectures defined by standardization organizations such as: 3GPP, BBF, IEEE, ITU-T, and other SDOs

Latest revision as of 13:56, 18 September 2018

AFI PoC Framework Document

The AFI Proof of Concept (PoC) Framework TS describes the full INT AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The published version of this document can be downloaded from: INT AFI PoC Framework

For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

AFI PoC Proposal Template (word)

AFI PoC Report Template (word)

Optional:

AFI PoC Test Plan Template (word)

AFI PoC Feedback Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by INT AFI WG. See details and current list of PoC Topics.

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least two vendors
  • The PoC Point of Contact will be an INT AFI WG Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, INT meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

AFI PoC Teams may request CTI assistance by contacting ETSI CTI.

About INT AFI

ETSI INT AFI WG as the leading group in the standardization landscape for autonomics, has a comprehensive work program which comprises deliverables on:

  • a reference model for a Generic Autonomic Network Architecture (GANA);
  • an implementation guide for the GANA reference model;
  • autonomics-enabled implementation-oriented architectures that are a result of GANA instantiations onto various reference architectures defined by standardization organizations such as: 3GPP, BBF, IEEE, ITU-T, and other SDOs