PoC Framework: Difference between revisions
(→Q&A) |
(→Q&A) |
||
Line 19: | Line 19: | ||
'''I would like to submit a POC proposal where can I find a Word version of the template?''' | '''I would like to submit a POC proposal where can I find a Word version of the template?''' | ||
You can find a link to the word version of the PoC Framework (including the templates) at | You can find a link to the word version of the PoC Framework (including the templates) at: | ||
http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version | |||
'''Do all of the POC participants have to be NFV ISG participants?''' | '''Do all of the POC participants have to be NFV ISG participants?''' | ||
No, it is only required that (at least) one of the supporting Network Operators or Service Providers is member of the NFV ISG. See Section 4.5 of the PoC Framework: | No, it is only required that (at least) one of the supporting Network Operators or Service Providers | ||
is member of the NFV ISG. | |||
See Section 4.5 of the PoC Framework: | |||
“4.5 NFV ISG PoC Proposal Acceptance Criteria | “4.5 NFV ISG PoC Proposal Acceptance Criteria | ||
The criteria for acceptance of NFV ISG PoC Proposals are: | The criteria for acceptance of NFV ISG PoC Proposals are: | ||
1) The NFV ISG PoC Proposal shall contain the information requested in the format of the NFV ISG PoC Proposal Template of clause A.1. | 1) The NFV ISG PoC Proposal shall contain the information requested in the format of the NFV ISG PoC | ||
2) The organizations participating in an PoC Project shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least the one Network Operator or the one Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “ | Proposal Template of clause A.1. | ||
2) The organizations participating in an PoC Project shall include at least two Manufacturers and at | |||
least one Network Operator or one Service Provider, where at least the one Network Operator or the one | |||
Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “ | |||
'''Where do I send the completed proposal?''' | '''Where do I send the completed proposal?''' | ||
Once your proposal completed, you need to: | Once your proposal completed, you need to: | ||
1) upload it to the ETSI portal as a regular contribution | 1) upload it to the ETSI portal as a regular contribution | ||
2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to the uploaded contribution included in the body. To be able to post your email, you will need to subscribe to that list if not already done. | 2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to | ||
See section 4.3 of the PoC Framework below, and do not hesitate to get back to NFVsupport if you need further help to upload your proposal to the portal. | the uploaded contribution included in the body. To be able to post your email, you will need to subscribe to | ||
that list if not already done. | |||
See section 4.3 of the PoC Framework below, and do not hesitate to get back to NFVsupport if you need further | |||
help to upload your proposal to the portal. | |||
“4.3 NFV ISG PoC Proposal Submission | “4.3 NFV ISG PoC Proposal Submission | ||
PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the NFV ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject line.” | PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal | ||
according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the NFV | |||
ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the | |||
dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject line.” | |||
= ETSI CTI Support = | = ETSI CTI Support = |
Revision as of 09:46, 28 November 2013
NFV ISG PoCs
NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.
Framework Document
The PoC Framework document can be downloaded at:
NFV-PER002-PoC Framework - pdf version.
NFV-PER002-PoC Framework - Word version.
You'll find the templates for PoC Proposals and PoC Reports at the end of those documents.
Q&A
See below some usual questions about the NFV ISG PoCs:
I would like to submit a POC proposal where can I find a Word version of the template? You can find a link to the word version of the PoC Framework (including the templates) at: http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version
Do all of the POC participants have to be NFV ISG participants? No, it is only required that (at least) one of the supporting Network Operators or Service Providers is member of the NFV ISG. See Section 4.5 of the PoC Framework: “4.5 NFV ISG PoC Proposal Acceptance Criteria The criteria for acceptance of NFV ISG PoC Proposals are: 1) The NFV ISG PoC Proposal shall contain the information requested in the format of the NFV ISG PoC Proposal Template of clause A.1. 2) The organizations participating in an PoC Project shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least the one Network Operator or the one Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “
Where do I send the completed proposal? Once your proposal completed, you need to: 1) upload it to the ETSI portal as a regular contribution 2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to the uploaded contribution included in the body. To be able to post your email, you will need to subscribe to that list if not already done. See section 4.3 of the PoC Framework below, and do not hesitate to get back to NFVsupport if you need further help to upload your proposal to the portal.
“4.3 NFV ISG PoC Proposal Submission PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the NFV ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject line.”
ETSI CTI Support
The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).
This experience may be useful to assist the PoC teams with test expertise, administration and project management support.
NFV ISG PoC Teams may request CTI assistance by contacting ETSI CTI.
About NFV ISG
Learn more about NFV at ETSI