Q&A: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== I would like to submit | == I would like to submit an AFI POC proposal where can I find a Word version of the template? == | ||
The | The NTECH AFI PoC Proposal and Report Templates are available at [[PoC Framework]] | ||
== Do all of the PoC Team members have to be | == Do all of the PoC Team members have to be ETSI members? == | ||
No, it is only required that (at least) the main point of contact of the POC is an ISG MEC member or participant. | No, it is only required that (at least) the main point of contact of the POC is an ISG MEC member or participant. | ||
PoC Proposal Acceptance Criteria are described in section 4.3 of the MEC PoC Framework and summarized [[PoC Framework]] page | PoC Proposal Acceptance Criteria are described in section 4.3 of the MEC PoC Framework and summarized [[PoC Framework]] page | ||
== How do I submit the completed | == How do I submit the completed AFI PoC Proposal? == | ||
Once your PoC Proposal completed, you need to: | Once your PoC Proposal completed, you need to: | ||
1) upload it to the ETSI portal as a regular contribution to | 1) upload it to the ETSI portal as a regular contribution to NTECH AFI WG | ||
2) send an email to | 2) send an email to NTECH_AFI@LIST.ETSI.ORG with [ADI PoC Proposal] in the subject line and a link to | ||
the uploaded contribution included in the body. To be able to post your email, you will need to subscribe | the uploaded contribution included in the body. To be able to post your email, you will need to subscribe | ||
to that list if not already done. See section 4.2 of the PoC Framework for further details. | to that list if not already done. See section 4.2 of the AFI PoC Framework for further details. |
Revision as of 08:03, 3 September 2015
I would like to submit an AFI POC proposal where can I find a Word version of the template?
The NTECH AFI PoC Proposal and Report Templates are available at PoC Framework
Do all of the PoC Team members have to be ETSI members?
No, it is only required that (at least) the main point of contact of the POC is an ISG MEC member or participant. PoC Proposal Acceptance Criteria are described in section 4.3 of the MEC PoC Framework and summarized PoC Framework page
How do I submit the completed AFI PoC Proposal?
Once your PoC Proposal completed, you need to: 1) upload it to the ETSI portal as a regular contribution to NTECH AFI WG 2) send an email to NTECH_AFI@LIST.ETSI.ORG with [ADI PoC Proposal] in the subject line and a link to the uploaded contribution included in the body. To be able to post your email, you will need to subscribe to that list if not already done. See section 4.2 of the AFI PoC Framework for further details.